Gold Member Since 2016
Audited Supplier
Zhejiang Debao Communication Technologies Co., Ltd.

Lattice Tower, Transmission Tower, Microwave Transmission manufacturer / supplier in China, offering Telecommunication Steel Lattice Tower, GSM Equipment Telecom Shelter, Cellular Mobile Station Mobile Telecommunication Vehicle and so on.

(/ )

Supplier Homepage Product Lattice Tower Telecommunication Steel Lattice Tower

Telecommunication Steel Lattice Tower

FOB Price: US $1,000-1,500 / Ton
Min. Order: 10 Tons
Min. Order FOB Price
10 Tons US $1,000-1,500/ Ton
Get Latest Price
Port: Shanghai, China
Production Capacity: 5000 Tons/Month
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Structure: Three-Column Steel Pipe Tower
  • Standard: Standard
  • Belly Bar Shape: Cross Type
  • Condition: New
  • Trademark: Debao Tower
  • Specification: 1-100m
  • HS Code: 7308200000
  • Shape: Vertical Type
  • Material: Steel Pipe Tower
  • Certification: ISO, Factory Inspection Certificate
  • Lifetime: 50 Years
  • Transport Package: Seaworthy/Landworthy
  • Origin: Hangzhou, Zhejiang, China
Product Description
Telecommunication Steel Lattice Tower


Company introduction: 
  Hangzhou Debao Electromechanical Manufacturing Co,. Ltd was founded in 2003. It's a professional manufacturer in communication tower, electrical tower, galvanizing process and decorative antenna and so on. With 163.8 million RMB registered capital and 700 employees, Debao has become the largest hot-dip galvanizing production base around East China( total 780 tons production capacity). Also, it is the manufacturing base of Zhejiang University Chemistry Laboratory galvanizing products and enterprise credit AAA company with ISO certificate. 
  We have 10000 square meter office building and 46000 square meter workshop equipped with high-level production lines for communication tower and hot-dip galvanizing, which constitute a strong guarantee for the company's high operation efficiency. Per market demand, Debao launched a series of landscaped tower, bionic tower, decorative antenna, portable mobile base station, which have been widely used by operators now.

Qualification:
Business license, tax registration certificate and organization code certificate, quality management system, occupational health management system, environmental management system, enterprise credit AAA. 

Construction Process:
1.Raw material inspection 
Check steel specification, grade and heat number when coming, and then send sample to the laboratory for testing. Welding material needs re-rest of welding; Purchased tower attachments also need retest. Any non-conforming material should be avoided to enter into the production line.

2.Mark sample number
After sample plate and rod made, all the samples need to be approved by customers, then reviewed and marked number. Marked number with digital control, steel tower needs to retain head margin when cutting according to process requirement, diameter of both tube ends need the conformance with matching welding tube. The deviation is not more than ± 1.5D/1000, the total height deviation is no more than H/1500.

3.Rolling tube
After marked number and qualified, then turn to roll tube. To keep the ellipticity of the sheet plate, rolling on rolling machine where roller can move horizontally, then weld the connecting line and recheck. Visual inspection after rolling, the roundness should not exceed 3mm.

4.Welding
After tube bending, inspection and approval, it goes to automatic welding. Before welding, bevel angle is 25 degrees, also welding edge needs removing rust, burrs and dirt, electrode must be dried, coating drops or rust core are not allowed, and damp solder is also not allowed. Clean each welding line and inspect, then re-weld after clear defects. After welding slag and spatter need to be cleaned up. Select T-joints and 20% nearby welding line on main tower UT test to achieve GB11345-1989BII.

5.Flange installation
The flange needs automatic welding and UT test qualified. After installation and appearance inspection, inspect the angle dimension, so as to make sure the tower get installed smoothly.

6.Test assembly
Each section of the tower needs assembly test. The technical department will make a complete inspection, including the welding line mechanical property, the tower dimensions (length deviation, connection flatness and straightness, tower tube ovality, tube diameter deviation) must comply with requirement before turning to next stage.

7.Galvanizing 
After tower assembly test galvanizing will apply. Hot dip galvanizing coating thickness needs 86um <M<200um and anti-corrosion more than 30 years. Visual inspection after galvanizing, residual point will be not more than 1 cm2, smooth surface, no zinc tumor and thorns.
 
8.Inspection after galvanizing 
Test assembly again after galvanizing qualified, and the requirements are the same with previous test assembly. If there is deviation it needs correction, then turn to next stage.

9.Painting
Grinding zinc coating by sand blasting or abrasive paper to make the surface flatness and smoothness but not to damage zinc coating, then spay 6 layers painting to make sure the tower's service life.

Specification
Avaivable Height:5-100M
Wind Pressure:5-180 KM/H
Material:Q345B/A572,minimum yield strength >=345N/mm2;
Q235B/A36,minimum yiled strenght>=235N/mm2;
Galvanized:Hot Dip Galvanization
Delivery Lead Time: 25 Days after receiving 30% Deposit
Lifetime:Minimum 25 years
Working & Resting Platform Quantity:1-3 PCS
Working & Resting Platform Quantity:3-18 PCS
Antenna Support Quantity :3-18 PCS
MOQ:1 Set 
  


Your inquiry is welcomed, if you have any other question, please let us know, we will do our best to supply the info as soon as possible
Send your message to this supplier
Avatar
Mr. Bob Xu
Director
*From:
To: Mr. Bob Xu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now